Week 40 ANSWERS
- What is the first step before managing Mesh Production Lines using the Bundle Tags application?
- Ensure you are logged into Elda(Chrome)
- Open the Mesh Production Line file
- Install the Bundle Tags application
- Why is the asterisk (*) mark critical during the process of adding a new Mesh Code?
- It highlights editable cells for existing Mesh Codes.
- It shows the location of a new empty row for data entry.
- It flags errors in the Mesh Production Tab.
- Which of the following actions could cause duplicate Mesh Codes in the system?
- Entering an incomplete Mesh Code and restarting the system.
- Failing to save changes after entering a new Mesh Code.
- Creating a new Mesh Code without verifying its existence.
- What sequence of correct actions is required to change the indicator color for a Mesh Code?
- Navigate to Batch Settings, select a color, and save the details.
- Enter a new Pack Size, open the color picker, and confirm with Save.
- Click on the color cell, pick a color, confirm with OK, and save changes.
- How can you validate that a new Mesh Code has been successfully saved?
- The Mesh Code shifts to the top of the list.
- The Mesh Code appears with a checkmark in the left-hand column.
- A confirmation message appears in the Changes Saved window.
WEEK 40 WINNERS :
- Victoria: Diane Christou
- Western Australia: Michelle McCaig
- New South Whales: Dannielle Alexander
- South Australia: Senthuran Jeyakumar
- Head Office: Dan Nahar
- Northern Territory: Daven Li
Comments (0 comments)