Week 40 - How to Set Up New Mesh Production Lines in Bundle Tags

 

Week 40 ANSWERS

  1. What is the first step before managing Mesh Production Lines using the Bundle Tags application?
    1. Ensure you are logged into Elda(Chrome)
    2. Open the Mesh Production Line file
    3. Install the Bundle Tags application

  2. Why is the asterisk (*) mark critical during the process of adding a new Mesh Code?
    1. It highlights editable cells for existing Mesh Codes.
    2. It shows the location of a new empty row for data entry.
    3. It flags errors in the Mesh Production Tab.

  3. Which of the following actions could cause duplicate Mesh Codes in the system?
    1. Entering an incomplete Mesh Code and restarting the system.
    2. Failing to save changes after entering a new Mesh Code.
    3. Creating a new Mesh Code without verifying its existence.

  4. What sequence of correct actions is required to change the indicator color for a Mesh Code?
    1. Navigate to Batch Settings, select a color, and save the details.
    2. Enter a new Pack Size, open the color picker, and confirm with Save.
    3. Click on the color cell, pick a color, confirm with OK, and save changes.

  5. How can you validate that a new Mesh Code has been successfully saved?
    1. The Mesh Code shifts to the top of the list.
    2. The Mesh Code appears with a checkmark in the left-hand column.
    3. A confirmation message appears in the Changes Saved window.

 

WEEK 40  WINNERS :

  • Victoria: Diane Christou
  • Western Australia: Michelle McCaig
  • New South Whales: Dannielle Alexander
  • South Australia:  Senthuran Jeyakumar
  • Head Office: Dan Nahar
  • Northern Territory: Daven Li



Was this article helpful?

0 out of 0 found this helpful
Have more questions? Submit a request

Comments (0 comments)

Please sign in to leave a comment.