Background
This guide shows how to mark jobs to indicate that they use local content.
Marking Local Content
From Scheduler
- Open the schedule which needs to be marked local content.(Please note that job should have been created from an Estimate for the Local Content option to be available)
- Open the Job Details form.
- On the Job Details tab tick the Local Content Only checkbox and click Save.
From Estimates
Estimates which are not locked can be marked local content . If a job is created from an estimate which is marked local content, it will automatically be applied to the job.
1. Click on the Edit button on the left to edit the estimate details.
2. Tick the Local Content Only checkbox and click Save.
In the CutOptimise details section, under Schedule view, any schedule which requires local content will be highlighted in orange color as seen in screenshot below.
Comments (0 comments)