Mike Campbell

Mike Campbell

Articles

Recent activity by Mike Campbell
Edited
1 follower 0 comments 1 vote
Changing Delivery Dates for Schedules on Manifest
Changing delivery dates for Schedules that are already on manifest and yet to be delivered is not possible through the Scheduler application as delivery drivers may have already been notified and o...
Edited
1 follower 0 comments 0 votes
Offcut Management - (Shearline type devices)
Cut optimiser allows management of offcuts generated during the cutting process. This allows maximum yield from source products and reduces workloads/cost involved in managing offcuts. Optimiser Se...
Edited
1 follower 0 comments 0 votes
Bulk Delivery Date/Time changes
Background A facility has been provided to update the delivery dates for multiple schedules. The system incorporates automatic request generation if the required date cannot be selected by the user...
Edited
1 follower 0 comments 1 vote
Schedule Requests
This facility allows you to request authorisation actions to be taken on one or more schedules for which you do not have sufficient authority. An example of this is that you wish to factory a sched...
Edited
1 follower 0 comments 0 votes
Reassigning work between different production areas
There exists several methods to move work between production devices within the Cut Optimiser interface. Shifting work from the Outstanding items grid Shifting work from the Production Lines summa...
Edited
1 follower 0 comments 0 votes
Joining Bitscan Touch Device to Network
Join Bitscan using Touchscreen The Bitscan device is usually supplied not configured to the customers WIFI network as a customer may have several Access Points on Premises.   Before a Bitscan Touch...
Edited
1 follower 0 comments 0 votes
Work-Load assignment with Cut Optimiser
Moving work between Loading Bays For this example we are given the following scenario. All work is currently scheduled to be sent from Bay E Bay E's Shearline is the S1-Schn...
Edited
1 follower 0 comments 0 votes
Customer Payment Claims
Background Invoices can be grouped for presentation to a customer under a consolidated Invoice using the Payment Claims Process. This knowledge base article provides the steps in issuing a paymen...
Edited
1 follower 0 comments 0 votes
Automatic Rule based Site Assignment
Using the general rebar rules, it is possible to assign work automatically to devices at different sites within system based on general production rules for the item to be made. For this to succe...
Edited
1 follower 0 comments 0 votes
Scanning Extended Heat Tag Data
Background To maintain heat traceability, data is required from Steel Suppliers to match Mill Certificate data to the final item being produced.  Sometimes this data is partially available from...
  • Total activity 56
  • Last activity
  • Member since
  • Following 0 users
  • Followed by 0 users
  • Votes 0
  • Subscriptions 27

Badges

You currently have no badges.