Friday Feature 2025 Week 13 - How to Set Up New Mesh Production Lines in Bundle Tags

 

Week 13 ANSWERS

  1. What is the first action required to begin creating a new Mesh Code within the Bundle Tags system?
    1. Click on the Batch Settings button
    2. Select the Mesh Code from the existing list
    3. Click on the Mesh Production button from the left-hand side of Bundle Tags
       
  2. Which window opens when you click the Batch Settings button under the Production Batch Details tab?
    1. Mesh Production Tab
    2. Mesh Batch Parameters Window
    3. Pack Size Configuration Panel
       
  3. What is the purpose of the asterisk (*) mark in the Mesh Code entry list?
    1. Indicates a locked entry
    2. Identifies the empty row to enter a new Mesh Code
    3. Marks a code that is being edited
       
  4. What is the correct sequence to navigate to the Mesh Batch Parameters window for modifying a Mesh Code?
    1. Bundle Tag Window → Mesh Production → Production Batch Details → Batch Settings
    2. Bundle Tag Window → Mesh Production → Mesh Production Tab
    3. Dashboard → Reports → Mesh Code Edit
       
  5. How do you confirm that a Mesh Code has been successfully modified?
    1. Wait for a confirmation email
    2. Check the dashboard log
    3. Re-open the Mesh Batch Parameters Window and verify under the Mesh Production Tab

 

Week 13  WINNERS :

  • Victoria: Praveen Fernando
  • Western Australia: Majella McTaggart
  • New South Wales: Liberty Duffield
  • South Australia: Liam Mendis
  • Head Office: Rebecca Clarke
  • Northern Territory: N/A
 

 

Week 13.gif
 

Was this article helpful?

0 out of 0 found this helpful
Have more questions? Submit a request

Comments (0 comments)

Please sign in to leave a comment.